This wrecking job had many sets of challenges. First, Big Dog had to remove and salvage 4 overhead cranes weighing over 10,000 pounds each. Our crews then had to manage two very different structures in the demolition process. One was a steel structure while the 2nd building was a combination of steel, concrete and concrete exterior partitions. This required many different types of equipment on the job simultaneously. An excavator with a 10,000lb hammer, a 100,000lb excavator/shear combo and our excavator/processor (all company owned equipment) combination made the job run smooth and finish ahead of schedule.
In addition our concrete crushing operation processed 100% of all concrete and masonry products to be re-used on site for future construction.
|